| Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 6 | Garland | 5 | 060 | 1.72 | 4.15 | Width Restriction Only | 07/03/2012 | Ongoing | 24 Hours | 11.00 | FT | | 11.00 | Job 061259. Width Restriction - All Lanes. Shoulders closed. |
| 6 | Pulaski | 5 | 090 | 3.82 | 3.87 | Width Restriction Only | 05/09/2012 | Ongoing | 24 Hours | 10.00 | FT | | 7.00 | Width Restriction - All Lanes. 10ft lanes and 2 ft shoulders, Job 060352 |
| 6 | Garland | 7 | 090 | 10.91 | 11.08 | North Bound | 05/20/2013 | 1 | 8:pm-12pm | | FT | | 9.00 | Traffic will be controled by flaggers |
| 8 | Yell | 7 | 130 | 2.50 | 11.30 | Alternating North & South Bound | 05/15/2013 | ongoing | 7 a.m. - 7 p.m. | 12.00 | FT | | 12.00 | Asphalt Paving Operation. |
| 6 | Pulaski | 10 | 080 | 14.40 | 15.00 | West Bound Outside | 05/13/2013 | 4 | 9 A.M. to 3 P.M. | | FT | | 10.00 | Bridge Deck and Section Loss Repairs |
| 9 | Benton | 12 | 030 | 0.81 | 1.99 | Alternating East & West Bound | 05/28/2013 | 4 | 7am - 8pm | | FT | | 12.00 | OVERLAY |
| 9 | Benton | 12 | 030 | 0.81 | 1.99 | Alternating East & West Bound | 05/20/2013 | 4 | 7AM - 8PM | | FT | | 12.00 | OVERLAY |
| 10 | Craighead | 18 | 040 | 17.09 | 23.03 | East & West Bound | 05/01/2012 | Ongoing | 24 Hours | 11.00 | FT | | 11.00 | Width Restriction - All Lanes. Job No. 100308 |
| 3 | Nevada | 24 | 050 | 0.00 | 0.10 | All | 05/21/2013 | 1 | 10 hours | | FT | | | Union Pacific repairing tracks. Follow detour route. |
| 5 | Cleburne | 25 | 020 | 2.51 | 4.93 | North & South Bound | 08/30/2012 | ongoing | 24 hours | 10.00 | FT | | 8.50 | Job 050166 ACHM Operations and RC Box work. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 5 | Cleburne | 25 | 020 | 2.51 | 4.93 | South Bound | 08/13/2012 | ongoing | 24 hours | 10.00 | FT | | 8.50 | Box Culvert and Shoulder work on JOb 050166 |
| 3 | Miller | 30 | 110 | 1.00 | 3.50 | East Bound Outside | 05/31/2012 | ONGOING | 9am - 3pm | 20.00 | FT | | 17.00 | Job 030378 - EAST BOUND. Temp closures required for overhead sign adjustments. |
| 3 | Miller | 30 | 110 | 2.68 | 5.00 | West Bound Outside | 05/08/2013 | ongoing | 9am - 3pm | 20.00 | FT | | 17.00 | Job 030378 - WEST BOUND - Temp shoulder closures for work on concrete barrier wall. |
| 3 | Miller | 30 | 110 | 14.00 | 16.00 | West Bound | 05/13/2013 | 10 | 7am - 7pm | 12.00 | FT | | 9.00 | Alternating inside/outside closures required for concrete panel lift and stabilization operations. |
| 3 | Miller | 30 | 110 | 14.00 | 16.00 | East Bound | 05/23/2013 | 5 | 7am-7pm | 12.00 | FT | | 9.00 | Alternating inside/outside closures for concrete panel lifting/slab stabilization. |
| 3 | Nevada | 30 | 130 | 46.14 | 46.14 | West Bound Outside | 05/20/2013 | 5 | 7:30am to 5:00pm | 15.00 | FT | | 12.00 | Bridge Cleaning and Painting by HBM. Lane closures may alternate between inside and outside lanes. |
| 7 | Clark | 30 | 140 | 77.02 | 80.60 | Alternating East & West Bound | 10/15/2012 | ongoing | 12am - 12pm | 19.00 | FT | | 16.00 | job 012149 - installing WRSF, alternate EB |
| 7 | Clark | 30 | 140 | 77.02 | 80.60 | Alternating East & West Bound | 10/14/2012 | ongoing | 6pm - 12am | 19.00 | FT | | 16.00 | job 012149 - installing WRSF, alternate EB |
| 6 | Hot-Spring | 30 | 210 | 80.60 | 105.46 | Alternating East & West Bound | 10/15/2012 | Ongoing | 12 a.m. - 12 p.m. | 19.00 | FT | 16.00 | 16.00 | Job 012149. Installing WRSF, Alternate Eastbound and Westbound Inside Lanes. 2 Mile Cosures. |
| 6 | Hot-Spring | 30 | 210 | 80.60 | 105.46 | Alternating East & West Bound | 10/14/2012 | Ongoing | 6 p.m. - 12 a.m. | 19.00 | FT | | 16.00 | Job 012149. Installing WRSF, Alternate Eastbound and Westbound Inside Lanes. 2 Mile Closures. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 6 | Saline | 30 | 220 | 105.46 | 106.90 | Alternating East & West Bound | 10/15/2012 | Ongoing | 12 a.m. - 12 p.m. | 19.00 | FT | 16.00 | 16.00 | Job 012149. Installing WRSF, Alternate Eastbound and Westbound Inside Lanes. 2 Mile Closures. |
| 6 | Saline | 30 | 220 | 105.46 | 106.90 | Alternating East & West Bound | 10/14/2012 | Ongoing | 6 p.m. - 12 a.m. | 19.00 | FT | 16.00 | 16.00 | Job 012149. Installing WRSF, Alternate Eastbound and Westbound Inside Lanes. 2 Mile Closures. |
| 6 | Pulaski | 30 | 230 | 136.00 | 136.50 | Left Shoulder | 05/22/2013 | 2 | 9 A.M. to 3 P.M. | | FT | | | Research project on median barrier wall - Inside shoulder closed only - Westbound |
| 3 | Nevada | 32 | 080 | 2.95 | 3.35 | All | 08/14/2012 | ONGOING | 24 HRS | | FT | | 10.00 | JOB 030386. DETOUR. WIDTH RESTRICTION. *NO WIDE LOADS* |
| 6 | Prairie | 38 | 010 | 18.25 | 18.85 | East Bound | 05/20/2013 | 5 | 8:am - 5:pm | | FT | | 9.00 | Utility Work - Replacing existing fiber optic cable on the bridge |
| 4 | Crawford | 40 | 110 | 0.00 | 2.75 | East Bound Inside | 04/04/2013 | Ongoing | 7 pm - 7 am | 15.00 | FT | | 12.00 | Eastbound Lanes Only. Shoulder work. Project 012168. |
| 4 | Crawford | 40 | 110 | 5.80 | 13.20 | East Bound Inside | 05/20/2013 | On | 7pm - 7 am | 15.00 | FT | | 12.00 | East bound lane shoulder work. Project 012168 |
| 4 | Crawford | 40 | 110 | 5.80 | 13.20 | West Bound Inside | 05/20/2013 | On Going | 7pm - 7 am | 15.00 | FT | | 12.00 | West bound Shoulder work. Project 012168 |
| 4 | Crawford | 40 | 110 | 15.50 | 24.55 | West Bound | 04/11/2013 | ongoing | 24 hours | 18.00 | FT | | 18.00 | Alternating lanes-inside/outside moving lane closure |
| 4 | Crawford | 40 | 110 | 15.50 | 24.55 | East Bound | 04/11/2013 | ongoing | 24 hours | 18.00 | FT | | 18.00 | Alternating lanes - inside/outside moving lane closure |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 4 | Franklin | 40 | 120 | 24.58 | 32.50 | West Bound | 04/11/2013 | ongoing | 24 hours | 18.00 | FT | | 18.00 | Alternating lanes-inside/outside moving lane closure |
| 4 | Franklin | 40 | 120 | 24.58 | 32.50 | East Bound | 04/11/2013 | ongoing | 24 hours | 18.00 | FT | | 18.00 | Alternating lanes - inside/outside moving lane closure |
| 8 | Pope | 40 | 220 | 73.00 | 84.22 | West Bound Outside | 01/14/2013 | On-Going | 24 Hours | 13.00 | FT | | 10.00 | Lane closure in Outside Lane build crossovers and shoulder work. |
| 8 | Pope | 40 | 220 | 73.00 | 84.22 | East Bound Outside | 01/14/2013 | On-Going | 24 Hours | 13.00 | FT | | 10.00 | Lane closure in Outside Lane build crossovers and shoulder work. |
| 8 | Pope | 40 | 220 | 94.50 | 98.83 | West Bound Inside | 04/29/2013 | Ongoing | 7 pm - 12am, 12 am - 2 pm | 15.00 | FT | | 12.00 | Alternating inside and outside lane closures for asphalt paving and bridge work Job BB0806 |
| 8 | Pope | 40 | 220 | 94.50 | 98.83 | East Bound Inside | 04/29/2013 | Ongoing | 7 pm - 12am, 12 am - 2 pm | 15.00 | FT | | 12.00 | Alternating inside and outside lane closures for asphalt paving and bridge work Job BB0806 |
| 8 | Conway | 40 | 310 | 98.83 | 113.10 | East Bound Inside | 04/29/2013 | Ongoing | 7 pm - 12am, 12 am - 2pm | 15.00 | FT | | 12.00 | Alternating inside and outside lane closures for asphalt paving and bridge work Job BB0806 |
| 8 | Conway | 40 | 310 | 98.83 | 113.10 | West Bound Inside | 04/29/2013 | Ongoing | 7 pm - 12am, 12 am - 2 pm | 15.00 | FT | | 12.00 | Alternating inside and outside lane closures for asphalt paving and bridge work Job BB0806 |
| 8 | Conway | 40 | 310 | 112.50 | 120.33 | East Bound Inside | 03/06/2013 | ongoing | 5 a.m. - 3 p.m. | 12.00 | FT | | 12.00 | Shoulder work as part of job 080465 |
| 8 | Conway | 40 | 310 | 112.50 | 120.33 | West Bound Inside | 02/22/2013 | ongoing | 5 a.m. - 3 p.m. | 12.00 | FT | | 12.00 | Shoulder work for guardrail widening as part of job 080465. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 8 | Faulkner | 40 | 320 | 120.33 | 125.00 | East Bound Inside | 03/08/2013 | ongoing | 5 a.m. - 3 p.m. | 12.00 | FT | | 12.00 | shoulder work as part of job 080465 |
| 8 | Faulkner | 40 | 320 | 120.33 | 125.00 | West Bound Inside | 03/08/2013 | ongoing | 5 a.m. - 3 p.m. | 12.00 | FT | | 12.00 | shoulder work as part of job 080465 |
| 8 | Faulkner | 40 | 320 | 125.20 | 133.40 | East Bound Inside | 03/21/2013 | 87 | 7 PM - 6 AM | | FT | | 12.00 | Lane closure in conjunction with project 080388 I-40 Widening. |
| 8 | Faulkner | 40 | 320 | 125.20 | 133.40 | West Bound Inside | 03/21/2013 | 87 | 8 PM - 7 AM | | FT | | 12.00 | Lane closure in conjunction with project 080388 I-40 Widening. |
| 8 | Faulkner | 40 | 320 | 133.40 | 137.50 | West Bound Inside | 04/29/2013 | 30 | 8PM-6AM | | FT | | 12.00 | In conjunction with Construction Project 080411 RE84 Office |
| 8 | Faulkner | 40 | 320 | 133.40 | 137.50 | East Bound Inside | 04/29/2013 | 30 | 7PM-5AM | | FT | | 12.00 | In conjunction with Construction Project 080411 RE84 Office |
| 6 | Pulaski | 40 | 330 | 148.75 | 148.75 | West Bound Outside | 03/08/2013 | Ongoing | 7:30am to 3:00pm | | FT | | | Intermittent Outside Lane Closures for Repairs to Damaged Overpass by HBM and Dist 6. |
| 6 | Pulaski | 40 | 330 | 148.75 | 148.75 | Right Shoulder | 03/07/2013 | Ongoing | 24 Hours | | FT | | | Westbound Right Shoulder Closed at the 148.75 Log Mile for Overpass Repairs by HBM and Dist. 6. |
| 6 | Pulaski | 40 | 330 | 156.00 | 163.80 | West Bound Outside | 04/18/2013 | Ongoing | 8:00 PM to 6:00 AM | 12.00 | FT | | 10.00 | Job 012177 WRSF Construction |
| 6 | Pulaski | 40 | 330 | 156.00 | 163.80 | East Bound Outside | 04/18/2013 | Ongoing | 8:00 PM to 8:00 AM | 12.00 | FT | | 10.00 | Job 012177 WRSF Construction |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 6 | Lonoke | 40 | 410 | 163.81 | 166.00 | East Bound Outside | 04/18/2013 | Ongoing | 8:00 PM to 8:00 AM | 12.00 | FT | | 10.00 | Job 012177 WRSF Construction |
| 6 | Lonoke | 40 | 410 | 163.81 | 166.00 | West Bound Outside | 04/18/2013 | Ongoing | 8:00 PM to 6:00 AM | 12.00 | FT | | 10.00 | Job 012177 WRSF construction |
| 6 | Lonoke | 40 | 410 | 170.00 | 181.00 | East Bound Outside | 05/10/2013 | ongoing | 8:00 PM to 8:00 am | 12.00 | FT | | 10.00 | Job 012177 WRSF Construction |
| 6 | Lonoke | 40 | 410 | 172.00 | 174.00 | East Bound Outside | 05/29/2013 | 3 | 24 Hours | 12.00 | FT | | 10.00 | Job 060897 Bridge Construction |
| 6 | Lonoke | 40 | 410 | 179.00 | 185.50 | West Bound Outside | 05/20/2013 | Ongoing | 7:00 PM to 8:00 AM | 12.00 | FT | | 10.00 | Job 012177 WRSF Construction |
| 6 | Prairie | 40 | 420 | 185.55 | 189.00 | West Bound Outside | 05/20/2013 | Ongoing | 7:00 PM to 8:00 AM | 12.00 | FT | | 10.00 | Job 012177 WRSF Construction |
| 6 | Prairie | 40 | 420 | 186.00 | 194.50 | East Bound Outside | 05/16/2013 | Ongoing | 8:00 PM TO 8;00 AM | 12.00 | FT | | 10.00 | Job 012177 WRSF Construction |
| 6 | Prairie | 40 | 420 | 193.50 | 205.40 | West Bound Outside | 01/04/2012 | Ongoing | 24 Hours | 11.00 | FT | | 8.50 | Job 061187 - Construction |
| 6 | Prairie | 40 | 420 | 193.50 | 205.40 | East Bound Outside | 01/04/2012 | Ongoing | 24 Hours | 11.00 | FT | | 8.50 | Job 061187 - Construction |
| 6 | Prairie | 40 | 420 | 198.50 | 199.50 | East & West Bound | 01/04/2012 | On Going | 24 hrs | | FT | | | White River Rest Area closed east and west bound due to Main Lane closed by Contractor |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 1 | Monroe | 40 | 430 | 205.40 | 215.74 | Width Restriction Only | 01/04/2012 | On going | 24 Hours | | FT | | 8.50 | East and west bound |
| 1 | Phillips | 49 | 100 | 24.50 | 25.70 | North & South Bound | 05/22/2013 | 1 | 7:00am-7:00p.m. | 12.00 | FT | | 9.00 | RR crossing work-Wide Loads must use Alternate Route. Crossover-both directions on Northbound side. |
| 1 | Phillips | 49 | 100 | 24.50 | 25.70 | North & South Bound | 05/23/2013 | 2 | 7:00am-7:00pm | 12.00 | FT | | 9.00 | RR crossing work-Crossover-both directions on Southbound side. Wide Loads must use Alternate Route. |
| 7 | Clark | 53 | 010 | 0.10 | 0.11 | All | 05/23/2013 | 1 | 7:45a.m-8:00p.m. | | FT | | | Thru Traffic detoured onto Hwy.67 |
| 1 | Crittenden | 55 | 110 | 6.80 | 8.50 | South Bound Inside | 05/03/2013 | Ongoing | 24 Hours | 18.00 | FT | | 15.00 | For BB0109 work. |
| 1 | Crittenden | 55 | 110 | 23.20 | 27.83 | North Bound Inside | 02/05/2013 | Ongoing | 24 hours | 17.00 | FT | | 14.00 | Shoulder Work. Job No. 012167 |
| 1 | Crittenden | 55 | 110 | 23.20 | 27.83 | South Bound Inside | 02/05/2013 | Ongoing | 24 hours | 17.00 | FT | | 14.00 | Shoulder Work. Job No. 012167 |
| 4 | Crawford | 59 | 050 | 25.30 | 25.40 | South Bound Outside | 05/09/2013 | 15 | 8:30 a.m. - 2:30 p.m. | 48.00 | FT | | 45.00 | Permit work for driveway construction. |
| 4 | Crawford | 64 | 020 | 2.20 | 2.43 | West Bound | 04/22/2013 | On Going | 24 | 12.00 | FT | | 9.00 | Eastbound traffic shifted to westbound side. Traffic seperated by barrier wall. Project BB0407 |
| 4 | Crawford | 64 | 020 | 2.20 | 2.43 | East Bound | 05/20/2013 | On going | 24 | 12.00 | FT | | 9.00 | Eastbound traffic shifted to westbound side. Traffic seperated by barrier wall. Project BB0407 |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 8 | Pope | 64 | 060 | 10.50 | 10.85 | East & West Bound | 03/15/2013 | ongoing | 24 hours | 12.00 | FT | | 9.00 | Wide Loads must use Alternate Route. |
| 8 | Faulkner | 64 | 090 | 8.30 | 17.60 | East Bound Inside | 03/11/2013 | 60 | 6 a.m.-7 p.m. | | FT | | 22.00 | Lane Closure for installation of wire rope safety fence in median - Job 080466 - RE84 |
| 8 | Faulkner | 64 | 090 | 8.30 | 17.60 | West Bound Inside | 03/11/2013 | 60 | 6 a.m.-7 p.m. | | FT | | 22.00 | Lane Closure for Installation of Wire Rope Safety Fence Job 080466 - RE84 |
| 3 | Hempstead | 67 | 020 | 13.20 | 13.60 | Alternating East & West Bound | 05/09/2013 | 16 | 7:30 am - 4:30 pm | | FT | 17.00 | 11.00 | Job 030393 SIGNAL REMOVAL. NO WIDE LOADS |
| 3 | Hempstead | 67 | 020 | 20.14 | 20.35 | North & South Bound | 09/02/2011 | Ongoing | 24 Hrs | | FT | | 12.00 | Width Restriction - All Lanes. Job No. 030152 |
| 6 | Pulaski | 67 | 100 | 8.55 | 10.00 | North Bound Inside | 05/13/2013 | 1 | 9 A.M. to 3 P.M. | | FT | | | Pot hole repairs and sweeping |
| 6 | Pulaski | 67 | 100 | 8.55 | 10.00 | South Bound Inside | 05/16/2013 | 1 | 9 A.M. to 3 P.M. | | FT | | | Pot hole repairs and sweeping |
| 6 | Pulaski | 67 | 100 | 10.00 | 11.10 | South Bound Inside | 05/15/2013 | 1 | 9 A.M. to 3 P.M. | | FT | | | Pot hole repairs and sweeping |
| 6 | Pulaski | 67 | 100 | 10.00 | 11.10 | North Bound Inside | 05/14/2013 | 1 | 9 A.M. to 3 P.M. | | FT | | | Pot hole repairs and sweeping |
| 5 | White | 67 | 130 | 4.19 | 9.36 | South Bound Outside | 05/01/2013 | Ongoing | 24 | 18.00 | FT | | 16.00 | Shoulder work. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 5 | White | 67 | 130 | 4.19 | 9.36 | North Bound Outside | 05/01/2013 | Ongoing | 24 | 18.00 | FT | | 16.00 | Shoulder work. |
| 6 | Garland | 70 | 090 | 0.00 | 4.30 | East Bound Inside | 05/29/2013 | 1 | 9 A.M. to 3 P.M. | | FT | | 16.00 | Median Wall Cleaning |
| 6 | Garland | 70 | 090 | 2.41 | 2.41 | East Bound Off Ramp | 02/01/2013 | Ongoing | 24 Hours | | FT | 17.50 | | Vertical clearance restriction only for new overhead sign structure - Job 061285. |
| 6 | Garland | 70 | 09B | 5.00 | 5.50 | West Bound Outside | 08/22/2012 | Ongoing | 24 Hrs. | 18.00 | FT | | 15.00 | Job 061285 - Construct WB Acceleration Lane |
| 6 | Prairie | 70 | 160 | 7.40 | 19.90 | Width Restriction Only | 01/04/2012 | Ongoing | 24 Hours | | FT | | 8.50 | Job 061187 - Routing to avoid I-40 and Hwy. 70 |
| 1 | Monroe | 70 | 170 | 0.00 | 7.73 | Width Restriction Only | 01/04/2012 | On going | 24 Hours | | FT | | 8.50 | |
| 3 | Miller | 71 | 010 | 4.20 | 4.30 | North & South Bound | 01/03/2013 | ongoing | 24 | 20.00 | FT | 18.50 | 17.00 | Job 030355. Setting concrete beams with safety platform installed beneath beams. |
| 4 | Sebastian | 71 | 14B | 2.40 | 2.60 | North Bound Outside | 05/21/2013 | 2 | 9:30 am - 2:30 pm | 33.00 | FT | 17.00 | 30.00 | Utility permit repair. |
| 9 | Benton | 71 | 190 | 3.00 | 5.03 | Alternating North & South Bound | 03/25/2013 | Ongoing | 8pm - 6am | | FT | | 12.00 | Installing Wire Rope Safety Fence |
| 2 | Jefferson | 79 | 09B | 4.46 | 6.11 | North & South Bound | 02/18/2013 | 95 | 12 hours | | FT | | 12.00 | Moving lane closure in Alternating lanes. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 6 | Garland | 88 | 040 | 1.81 | 2.28 | Width Restriction Only | 06/20/2012 | Ongoing | 24 Hours | 11.00 | FT | | 8.50 | Job No. 061113 - Widen to five lanes. |
| 6 | Lonoke | 89 | 010 | 1.50 | 2.50 | North & South Bound | 03/18/2013 | Ongoing | 7:00 am to 6:00 pm | | FT | | | Job 060897 Detour construction |
| 10 | Randolph | 93 | 010 | 10.23 | 10.26 | Alternating North & South Bound | 05/20/2013 | 4 | 7:30am to 5:00pm | 12.00 | FT | | 9.00 | One Lane Road due to Bridge Repairs by HBM. No Loads Over 9 Feed Wide. |
| 9 | Benton | 102 | 030 | 0.45 | 0.52 | Alternating East & West Bound | 05/29/2013 | 3 | 7:30pm - 5:30am | | FT | | 11.00 | Installing Pipe |
| 9 | Benton | 102 | 030 | 5.40 | 5.91 | Alternating East & West Bound | 05/17/2013 | 7 | 8pm - 9am | | FT | | 12.00 | OVERLAY |
| 7 | Cleveland | 167 | 080 | 6.90 | 8.71 | Width Restriction Only | 02/07/2013 | Ongoing | 24 Hours | 13.00 | FT | | 10.00 | Width Restriction in NB and SB lanes due to Construction job 070291 |
| 7 | Dallas | 167 | 090 | 0.00 | 2.30 | Width Restriction Only | 02/07/2013 | Ongoing | 24 Hours | 13.00 | FT | | 10.00 | Width Restriction in NB and SB lanes due to Construction Job 070291 |
| 3 | Hempstead | 195 | 010 | 0.54 | 0.79 | North & South Bound | 08/10/2010 | Ongoing | 24 Hours | | FT | | | Temporary Detour. No change in Horizontal or Vertical Clearance. |
| 1 | Phillips | 242 | 000 | 2.20 | 2.40 | All | 05/24/2013 | 2 | 7:00am-7:00pm | | FT | | | RR Crossing work. Detour Hwy 44 and Hwy 49. Wide Loads must use Alternate Route. |
| 3 | Miller | 245 | 010 | 5.50 | 6.50 | North Bound Inside | 02/08/2013 | ONGOING | 24 | 12.00 | FT | | 9.00 | Job 030378 - Inside lane closed for construction operations. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 3 | Miller | 245 | 010 | 5.50 | 6.50 | South Bound Inside | 02/08/2013 | ongoing | 24 | 12.00 | FT | | 9.00 | Job 030378 - Inside closure for construction operations. |
| 3 | Miller | 245 | 010 | 6.80 | 7.00 | North Bound Off Ramp | 05/21/2013 | 4 | 7am-7pm | | FT | | | Job 030378. NB Exit Ramp to be closed on 5/21 and 5/23 for asphalt operations. |
| 3 | Miller | 245 | 010 | 6.80 | 7.00 | South Bound On Ramp | 05/21/2013 | 4 | 7am-7pm | | FT | | | Job 030378 - SB On Ramp at Ark. Blvd to be closed 5/21 and 5/23 for asphalt operations. |
| 3 | Miller | 245 | 010 | 7.00 | 8.00 | South Bound | 05/20/2013 | 5 | 7am-7pm | | FT | 13.50 | | Job 030378. SB traffic to use temp detour route for asphalt operations. |
| 4 | Washington | 265 | 020 | 6.75 | 7.90 | North Bound Center | 02/04/2013 | Ongoing | 24 Hours | 11.00 | FT | | 8.00 | Width Restrictions All Lanes. Center Turning Lane is Closed. |
| 6 | Garland | 270 | 050 | 10.27 | 11.45 | Width Restriction Only | 08/22/2012 | Ongoing | 24 Hrs. | 11.00 | FT | | 11.00 | Job 061059 - Detour in place to allow Contractor to extend pipe and box culvert. |
| 6 | Garland | 270 | 050 | 12.75 | 13.29 | Width Restriction Only | 08/22/2012 | Ongoing | 24 Hrs. | 11.00 | FT | | 11.00 | Job 061059 - Detour in place to allow Contractor to extend pipe and box culvert. |
| 6 | Garland | 270 | 060 | 0.00 | 4.30 | East Bound Inside | 05/21/2013 | 3 | 9 A.M. to 3 P.M. | | FT | | 16.00 | Median Wall Cleaning |
| 2 | Jefferson | 270 | 110 | 5.99 | 6.72 | Alternating East & West Bound | 05/21/2013 | 20 | 7:00a.m. - 7:00 p.m. | 12.00 | FT | | 12.00 | Asphalt Paving Operation. This job is with the small closure on Hwy 365 section 14s |
| 3 | Howard | 278 | 020 | 4.35 | 4.85 | Alternating East & West Bound | 05/15/2013 | 9 | 8:00 am - 4:00 pm | 11.00 | FT | | 8.00 | Bridge Deck Repairs. NO WIDE LOADS. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 3 | Hempstead | 299 | 000 | 0.08 | 0.18 | Alternating North & South Bound | 05/22/2013 | 8 | 7am - 3pm | 14.00 | FT | | 11.00 | Deck repairs-Width Restriction |
| 2 | Jefferson | 365 | 14S | 0.00 | 0.10 | Alternating East & West Bound | 05/21/2013 | 20 | 7:00a.m. - 7:00 p.m. | 12.00 | FT | | 12.00 | Asphalt Paving Operation. This job is with the closure on Hwy 270 section 11 lm 5.99- 6.72 |
| 9 | Madison | 412 | 030 | 5.44 | 10.72 | Width Restriction Only | 05/15/2012 | on | 24 Hours | 13.00 | FT | | 10.00 | East and West Bound Lanes width restriction |
| 6 | Pulaski | 430 | 210 | 5.34 | 6.53 | North Bound Outside | 05/27/2011 | Ongoing | 24 hours | | FT | | | Job 061244: Construction |
| 6 | Pulaski | 430 | 210 | 5.53 | 7.68 | North & South Bound | 05/30/2012 | ongoing | 24 hrs | 11.00 | FT | | 8.50 | Job 061244: lane width restrictions to allow Stages 5A, 4C, 4D construction |
| 6 | Pulaski | 430 | 210 | 6.00 | 6.50 | South Bound On Ramp | 05/15/2013 | 15 | 9 p.m. to 5 a.m. | | FT | | | Job 061244: Detour in place. WB-630 to SB I-430 CD onramp closed. |
| 6 | Pulaski | 430 | 210 | 6.00 | 6.50 | South Bound Outside | 05/15/2013 | 15 | 9 p.m. to 5 a.m. | 12.00 | FT | | 9.00 | Job 061244: Bridge Girder painting SB outside lanes |
| 6 | Pulaski | 430 | 210 | 6.75 | 8.25 | South Bound Outside | 03/14/2011 | ongoing | 24 hours | | FT | | | Job 061244: Placement of concrete barrier walls, 2 lanes of mainlane traffic will be open. |
| 6 | Pulaski | 430 | 210 | 12.80 | 12.95 | North Bound Off Ramp | 05/21/2013 | 2 | 9:am-3:pm | 12.00 | FT | | 9.00 | I430 NB off ramp to I-40 WB. Closing 1/2 width for Bridge Inspection |
| 6 | Pulaski | 440 | 010 | 9.82 | 9.93 | West Bound On Ramp | 05/20/2013 | 4 | 9:00am to 3:00pm | 12.00 | FT | | 9.00 | I-40 EB WB Off Ramps On to I-440 WB Lane Narrows due to Bridge Repairs by HBM. NO WIDE LOADS. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 6 | Pulaski | 530 | 010 | 8.76 | 9.18 | Width Restriction Only | 04/05/2013 | Ongoing | 24 Hours | 12.00 | FT | | 9.00 | Crossover-both directions on Northbound side at Bingham Rd over Lorance Creek on Job BB0614. |
| 6 | Saline | 530 | 020 | 9.18 | 9.40 | Width Restriction Only | 04/05/2013 | Ongoing | 24 Hours | 12.00 | FT | | 9.00 | Crossover-both directions on Northbound side at Bingham Rd. over Lorance Creek on job BB0614. |
| 2 | Grant | 530 | 040 | 16.38 | 17.78 | North Bound Inside | 12/31/2012 | 240 | 24 | 14.00 | FT | | 8.50 | Crossover-both directions on Southbound side. |
| 2 | Grant | 530 | 040 | 16.38 | 17.77 | South Bound Inside | 12/31/2012 | 300 | 24 | 16.00 | FT | | 14.00 | Crossover-both directions on Southbound side. |
| 2 | Jefferson | 530 | 050 | 17.78 | 23.77 | South Bound Inside | 12/31/2012 | 300 | 24 | 16.00 | FT | | 14.00 | Crossover-both directions on Southbound side. |
| 2 | Jefferson | 530 | 050 | 17.78 | 23.77 | North Bound Inside | 12/31/2012 | 240 | 24 | 14.00 | FT | | 8.50 | Crossover-both directions on Southbound side. |
| 2 | Jefferson | 530 | 050 | 29.87 | 46.37 | North & South Bound | 03/01/2013 | 90 | 24 hr | | FT | | 12.00 | Installing Safety Cables |
| 2 | Jefferson | 530 | 050 | 41.38 | 42.04 | South Bound Outside | 05/22/2013 | ongoing | 24 hours | 12.00 | FT | | 12.00 | Concrete pavement repairs. |
| 4 | Sebastian | 540 | 010 | 5.21 | 11.87 | East & West Bound | 01/28/2013 | Ongoing | 24 Hours | 11.50 | FT | | 8.50 | I-540 inside lane East and West bound will be closed. Both reduced to one lane. Job BB0407 |
| 4 | Crawford | 540 | 020 | 11.88 | 14.71 | East & West Bound | 01/28/2013 | Ongoing | 24 Hours | 11.50 | FT | | 8.50 | I-540 inside lanes East and West bound will be closed. Both reduced to one lane. Job BB0407. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 4 | Crawford | 540 | 030 | 39.65 | 39.80 | South Bound Outside | 01/03/2013 | ongoing | 24 | | FT | | | lane closure only no width restriction |
| 4 | Washington | 540 | 040 | 69.00 | 70.00 | Alternating North & South Bound | 05/21/2013 | 3 | 8:30-3:30 | 18.00 | FT | | 15.00 | Asphalt Paving Operation. Alternating lanes. |
| 6 | Pulaski | 630 | 210 | 2.00 | 4.00 | West Bound Outside | 05/06/2013 | 1 | 9 A.M. to 3 P.M. | | FT | | | Pavement Testing |
| 6 | Pulaski | 630 | 210 | 2.00 | 4.00 | East Bound Inside | 05/08/2013 | 2 | 9 A.M. to 3 P.M. | | FT | | | Shoulder Repair |
| 6 | Pulaski | 630 | 210 | 2.00 | 4.00 | West Bound Inside | 05/07/2013 | 1 | 9 A.M. to 3 P.M. | | FT | | | Shoulder Repair |
| 6 | Pulaski | 630 | 210 | 7.04 | 7.39 | East Bound Inside | 05/21/2013 | 4 | 9:00 am to 3:00 pm | | FT | | | Job 061244: Inside lane closure begins 350 ft west of Shklfrd on FCP to remove barrier wall |
| 6 | Pulaski | 630 | 210 | 7.04 | 7.39 | East Bound Inside | 05/21/2013 | 3 | 9:00 pm to 5:00 am | | FT | | | Job 061244: Inside lane closure begins 350 ft west of Shklfrd on FCP to remove barrier wall |
| 6 | Pulaski | 630 | 210 | 7.38 | 7.39 | East & West Bound | 05/20/2013 | 5 | 9:00 am to 3:00 pm | | FT | | | Job 061244: Outside lane closure begins 650 ft and ends 2150 ft west of Shklfrd on FCP |
| 6 | Pulaski | 630 | 210 | 7.39 | 7.40 | West Bound | 02/17/2013 | ongoing | 24 hrs | | FT | | | Job 061244: No left turn WB I-630 to SB Shackleford Rd |